01
Contribution to TSI, EECT and Charnge Request management
02
Engineering Support
Solving engineering challenges through collaboration
03
Testing & Validation
Testing and validating ERTMS onboard and trackside products
04
Automatic Train Operation (ATO)
Advancing automated rail operations
05
Hybrid Train Detection
Increasing capacity through innovative train detection
06
Security (RSEG)
Strengthening cybersecurity for ERTMS
07
EU-Rail System Pillar
Shaping the future architecture of European railway control systems
08
Localisation Working Group (LWG)
Advancing the future of train localisation
09
National Program Managers (NPM) Network
Coordinating national ERTMS deployment plans
The ERTMS Users Group supports its members in interpreting CCS TSI specifications and addressing technical and operational challenges arising during ERTMS deployment, operation, and maintenance. Technical issues identified through implementation projects or raised by members and sector organisations are first assessed within EUG, to identify practical engineering solutions whenever possible, without requiring changes to the specifications.
When clarifications or specification updates are necessary, EUG actively contributes to the European Union Agency for Railways (ERA) Change Control Management (CCM) process, working closely with ERA and UNISIG experts. This includes submitting and reviewing Change Requests, providing technical expertise, and supporting the assessment and resolution of proposed enhancements to the current TSI through the EECT.
Throughout this process, EUG ensures that proposed solutions reflect the operational needs and collective interests of railway organisations, contributing to the continuous improvement, consistency, and interoperability of ERTMS.